[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"case:gaft-innovations-bv-94970920:header:guest:personal:":3,"case:gaft-innovations-bv-94970920:comparison:guest:personal::{}":79},{"id":4,"slug":5,"name":6,"trade_names":7,"status":8,"procedure":9,"procedure_type":10,"insolvency_number":29,"case_number":29,"declared_on":30,"terminated_on":14,"termination_reason":14,"kvk_number":31,"legal_form":32,"sbi":14,"court":35,"judge":38,"judge_source":39,"curator":40,"location":46,"counts":55,"pages":61,"follower_count":60,"report_count":56,"last_report_on":73,"last_update_at":74,"freshness":75,"linked":78},"01M4EC615DXS2MPNF2MB6ZQGSM","gaft-innovations-bv-94970920","GAFT Innovations B.V.",[],"active","bankruptcy",{"id":11,"key":9,"family":12,"name":13,"short_name":14,"legal_basis":15,"features":19},"01M3Y8CPCPT53NPXHK39BWK1QY","insolvency","Faillissement",null,{"name":16,"provision":17,"url":18},"Faillissementswet","Titel I (art. 1 e.v.)","https:\u002F\u002Fwetten.overheid.nl\u002FBWBR0001860",[20,21,22,23,24,25,26,27,28],"reports","financials","creditors","assets","investigations","curator_workspace","appointments","court_decisions","portfolio_monitoring","F.02\u002F26\u002F41","2026-02-10","94970920",{"value":33,"source":34},"BV","cir",{"name":36,"slug":37,"location":14},"Rechtbank Zeeland-West-Brabant","zeeland-west-brabant","mr. M.D.E. Leppens",{"type":34,"report_number":14,"published_on":14},{"name":41,"slug":42,"law_firm":43,"city":44,"verified":45},"mr. S.A.C.R. Wahlbrinck","sacr-wahlbrinck","Van Iersel Luchtman N.V.","Breda",false,{"street":47,"house_number":48,"addition":49,"postal_code":50,"city":44,"municipality":44,"province":51,"lat":52,"lng":53,"kind":54,"source":34},"Weidehek","66","A","4824AS","Noord-Brabant",51.616586,4.759969,"business",{"reports":56,"documents":57,"assets":58,"investigations":59,"news":60},3,7,9,6,0,{"overview":62,"reports":64,"financials":65,"investigations":66,"assets":67,"timeline":68,"documents":69,"news":70,"company":71,"compare":72},{"index":63,"ads":63},true,{"index":63,"ads":63},{"index":63,"ads":63},{"index":63,"ads":45},{"index":63,"ads":45},{"index":63,"ads":45},{"index":63,"ads":45},{"index":45,"ads":45},{"index":63,"ads":45},{"index":45,"ads":45},"2026-09-24","2026-10-09T07:15:07+00:00",{"last_checked_at":76,"last_reconciled_at":76,"stale":45,"status":77},"2026-10-08T18:25:05+00:00","current",{"continued_from":14,"continued_as":14},{"data":80,"meta":277},{"from":81,"to":87,"values":91,"topics":174,"summary":275,"method":107,"created_at":74},{"id":82,"number":83,"title":84,"published_on":85,"document_url":86},"01M4EC64TR7SDEKNCAD1NN47E7",2,"Verslag:  24-06-2026","2026-06-24","https:\u002F\u002Ffaillissement.app\u002Fdocuments\u002F01M4EC66AKG38YYJ32X4BJ08CC.pdf",{"id":88,"number":56,"title":89,"published_on":73,"document_url":90},"01M4EC68NGEAMYARCXEHPKE9BX","Verslag:  24-09-2026","https:\u002F\u002Ffaillissement.app\u002Fdocuments\u002F01M4EC6A67TZ848WDT4TYHTEFM.pdf",[92,124,141,158],{"field":93,"kind":94,"change":95,"from":96,"to":100,"delta":102,"delta_ratio":103,"from_source":104,"to_source":117},"estate_claims","amount","changed",{"value":97,"state":98,"qualifier":99},28306.98,"known","combined",{"value":101,"state":98,"qualifier":99},96867.93,68560.95,2.4221,{"id":105,"category":106,"method":107,"source_type":108,"document":109,"page":112,"section":113,"excerpt":114,"certainty":115,"curator_verified_at":14,"processed_at":116},596860,"automated","deterministic","cir_report",{"id":110,"title":84,"report_number":83,"report_date":85,"published_on":85,"page_count":111,"url":86,"available":63},"01M4EC66AKG38YYJ32X4BJ08CC",20,16,"8.1 Boedelvorderingen","€ 28.306,98 Toelichting Het salaris van de curator is een boedelvordering, de hoogte hiervan staat nog niet vast. ClaimsAgent heeft een boedelvordering, de hoogte hiervan staat nog niet vast. GAFT B.V. Huurvordering 1 - boedelperiode € 8.471,04 Huurvordering 2 - boedelperiode € 11.881,00 Coval Energy B.V. Loonvordering (bruto) w erknemer € 7.954,94",0.95,"2026-10-08T19:22:40+00:00",{"id":118,"category":106,"method":107,"source_type":108,"document":119,"page":122,"section":113,"excerpt":123,"certainty":115,"curator_verified_at":14,"processed_at":116},596942,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"01M4EC6A67TZ848WDT4TYHTEFM",22,17,"€ 96.867,93 Toelichting Salaris curator, de hoogte hiervan staat nog niet vast; ClaimsAgent, de hoogte hiervan staat nog niet vast; GAFT B.V.: UW V, premie w g-deel SV ex art 66 lid 3 W W € 6.672,29 UW V, loonvordering ex art 66 lid 1 W W € 42.296,96 Coval Energy B.V.: UW V, premie w g-deel SV ex art 66 lid 3 W W € 2.191,68 UW V, loonvordering ex art 66 lid 1 W W € 22.447,74 W erknemer, loonvorder",{"field":125,"kind":94,"change":95,"from":126,"to":128,"delta":130,"delta_ratio":131,"from_source":132,"to_source":137},"preferential_claims",{"value":127,"state":98,"qualifier":99},11477,{"value":129,"state":98,"qualifier":99},57919.49,46442.49,4.0466,{"id":133,"category":106,"method":107,"source_type":108,"document":134,"page":122,"section":135,"excerpt":136,"certainty":115,"curator_verified_at":14,"processed_at":116},596863,{"id":110,"title":84,"report_number":83,"report_date":85,"published_on":85,"page_count":111,"url":86,"available":63},"8.2 Pref. vord. van de fiscus","€ 11.477,00 Toelichting GAFT B.V. - Loonheffing € 8.017,00 GAFT Holding B.V. - Omzetbelasting € 382,00 Coval Energy B.V. - Omzetbelasting € 494,00 Coval Energy B.V. - Loonheffing € 2.584,00",{"id":138,"category":106,"method":107,"source_type":108,"document":139,"page":140,"section":135,"excerpt":136,"certainty":115,"curator_verified_at":14,"processed_at":116},596945,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},19,{"field":142,"kind":94,"change":95,"from":143,"to":145,"delta":147,"delta_ratio":148,"from_source":149,"to_source":155},"concurrent_claims",{"value":144,"state":98,"qualifier":99},1027247.43,{"value":146,"state":98,"qualifier":99},1497598.26,470350.83,0.4579,{"id":150,"category":106,"method":107,"source_type":108,"document":151,"page":152,"section":153,"excerpt":154,"certainty":115,"curator_verified_at":14,"processed_at":116},596862,{"id":110,"title":84,"report_number":83,"report_date":85,"published_on":85,"page_count":111,"url":86,"available":63},18,"8.6 Bedrag concurrente crediteuren","€ 1.027.247,43 Toelichting GAFT B.V. Aantal: 23 Bedrag: € 1.021.905,48 Coval Energy B.V. Aantal: 3 Bedrag: € 5.341,95",{"id":156,"category":106,"method":107,"source_type":108,"document":157,"page":111,"section":153,"excerpt":154,"certainty":115,"curator_verified_at":14,"processed_at":116},596944,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},{"field":159,"kind":160,"change":95,"from":161,"to":163,"delta":56,"delta_ratio":165,"from_source":166,"to_source":171},"creditor_count","count",{"value":162,"state":98,"qualifier":99},26,{"value":164,"state":98,"qualifier":99},29,0.1154,{"id":167,"category":106,"method":107,"source_type":108,"document":168,"page":152,"section":169,"excerpt":170,"certainty":115,"curator_verified_at":14,"processed_at":116},596861,{"id":110,"title":84,"report_number":83,"report_date":85,"published_on":85,"page_count":111,"url":86,"available":63},"8.5 Aantal concurrente crediteuren","26 Toelichting GAFT B.V. Aantal: 23 Bedrag: € 1.021.905,48 Coval Energy B.V. Aantal: 3 Bedrag: € 5.341,95",{"id":172,"category":106,"method":107,"source_type":108,"document":173,"page":111,"section":169,"excerpt":170,"certainty":115,"curator_verified_at":14,"processed_at":116},596943,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},[175,185,195,203,210,219,227,234,241,248,255,262,270],{"topic":176,"change":177,"from":178,"to":178,"investigation":45,"to_source":179},"lease_contracts","unchanged","mentioned",{"id":180,"category":106,"method":107,"source_type":108,"document":181,"page":57,"section":182,"excerpt":183,"certainty":184,"curator_verified_at":14,"processed_at":116},596951,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"1.4 Huur","De opzegtermijnen van het laboratorium in Utrecht en het huurpand in Breda zijn inmiddels verstreken. De apparatuur heeft tot en met 21 mei 2026 op het 2 laboratorium gestaan. Hierna is het laboratorium opgeleverd. De huur van het pand in Breda is met toestemming van de verhuurder voor een w eek verlengd tot en met 26 mei 2026, w aarna het is opgeleverd.",0.5,{"topic":186,"change":187,"from":188,"to":187,"investigation":63,"to_source":189},"causes_investigation","completed","ongoing",{"id":190,"category":106,"method":107,"source_type":108,"document":191,"page":57,"section":192,"excerpt":193,"certainty":194,"curator_verified_at":14,"processed_at":116},596953,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"1.5 Oorzaak faillissement","De curator heeft de oorzaken van het faillissement onderzocht en heeft hierover vragen gesteld aan het bestuur. Hieruit is gebleken dat de door het 3 bestuur omschreven oorzaken de curator niet onjuist voorkomen. De curator acht het oorzakenonderzoek afgerond.",0.7,{"topic":196,"change":177,"from":178,"to":178,"investigation":45,"to_source":197},"employees",{"id":198,"category":106,"method":107,"source_type":108,"document":199,"page":200,"section":201,"excerpt":202,"certainty":184,"curator_verified_at":14,"processed_at":116},596954,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},8,"2.3 Ontslagaanzegging","5 Coval Energy B.V. totaal 15",{"topic":204,"change":177,"from":178,"to":178,"investigation":45,"to_source":205},"asset_sales",{"id":206,"category":106,"method":107,"source_type":108,"document":207,"page":58,"section":208,"excerpt":209,"certainty":184,"curator_verified_at":14,"processed_at":116},596955,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"3.1 Onroerende zaken","Beschrijving Verkoopopbr. Hypotheek Boedelbijdr. Niet van toepassing totaal € 0,00 € 0,00 Toelichting onroerende zaken 10-03-2026 Het is de curator niet gebleken van onroerende zaken die tot de boedel behoren.",{"topic":211,"change":188,"from":212,"to":212,"investigation":45,"to_source":213},"receivables_collection","investigating",{"id":214,"category":106,"method":107,"source_type":108,"document":215,"page":216,"section":217,"excerpt":218,"certainty":194,"curator_verified_at":14,"processed_at":116},596963,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},11,"4.1 Debiteuren","In aanvulling op Temasek, is tevens gebleken van een mogelijke vordering (nabetaling) van ongeveer € 100.000,00 uit het ConsenCUS-traject van Coval 2 Energy B.V. Het ConsenCUS-traject betreft een in 2021 toegekende Horizon 2020-subsidie onder een Grant Agreement. Het traject is gericht op elektrochemische CO₂-reductie, formiaatproductie, mierenzuurproductie en demonstratie-opstelling. Binnen dit t",{"topic":220,"change":177,"from":178,"to":178,"investigation":45,"to_source":221},"security_rights",{"id":222,"category":106,"method":107,"source_type":108,"document":223,"page":224,"section":225,"excerpt":226,"certainty":184,"curator_verified_at":14,"processed_at":116},596965,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},13,"5.3 Beschrijving zekerheden","Vooralsnog zijn er geen partijen die zich bij de curator hebben gemeld met zekerheidsrechten.",{"topic":228,"change":177,"from":178,"to":178,"investigation":45,"to_source":229},"going_concern",{"id":230,"category":106,"method":107,"source_type":108,"document":231,"page":112,"section":232,"excerpt":233,"certainty":184,"curator_verified_at":14,"processed_at":116},596971,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"6.8 Werkzaamheden doorstarten onderneming","De curator heeft de benodigde w erkzaamheden verricht, w aaronder het spreken met diverse kandidaat-doorstarters, onderhandelingen voeren met de 2 koper over de doorstartovereenkomst en uiteindelijk ook opstellen en redigeren van de doorstartovereenkomst.",{"topic":235,"change":177,"from":178,"to":178,"investigation":63,"to_source":236},"bookkeeping_duty",{"id":237,"category":106,"method":107,"source_type":108,"document":238,"page":112,"section":239,"excerpt":240,"certainty":184,"curator_verified_at":14,"processed_at":116},596972,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"7.1 Boekhoudplicht","De curator heeft de administratie onderzocht en is tot de conclusie gekomen dat de aangeleverde administratie voldoet aan de daaraan te stellen 3 w ettelijke vereisten.",{"topic":242,"change":177,"from":187,"to":187,"investigation":63,"to_source":243},"annual_accounts_filing",{"id":244,"category":106,"method":107,"source_type":108,"document":245,"page":112,"section":246,"excerpt":247,"certainty":194,"curator_verified_at":14,"processed_at":116},596973,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"7.2 Depot jaarrekeningen","Uit het register van de Kamer van Koophandel blijkt dat de jaarrekeningen over boekjaar 2023 en 2024 op 31 december 2025 zijn gedeponeerd. Dit 1 betekent dat de jaarrekening over boekjaar 2023 niet tijdig is gedeponeerd.",{"topic":249,"change":177,"from":178,"to":178,"investigation":63,"to_source":250},"director_liability",{"id":251,"category":106,"method":107,"source_type":108,"document":252,"page":122,"section":253,"excerpt":254,"certainty":184,"curator_verified_at":14,"processed_at":116},596974,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"7.5 Onbehoorlijk bestuur","Toelichting Uit het rechtmatigheidsonderzoek is het de curator niet gebleken van onbehoorlijk bestuur.",{"topic":256,"change":95,"from":212,"to":178,"investigation":63,"to_source":257},"paulianas",{"id":258,"category":106,"method":107,"source_type":108,"document":259,"page":122,"section":260,"excerpt":261,"certainty":184,"curator_verified_at":14,"processed_at":116},596975,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},"7.6 Paulianeus handelen","Nee Toelichting Het is de curator niet gebleken van paulianeus handelen.",{"topic":263,"change":177,"from":178,"to":178,"investigation":63,"to_source":264},"proceedings",{"id":265,"category":106,"method":107,"source_type":108,"document":266,"page":267,"section":268,"excerpt":269,"certainty":184,"curator_verified_at":14,"processed_at":116},596979,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},21,"9.4 Werkzaamheden procedures","Niet van toepassing.",{"topic":271,"change":95,"from":212,"to":178,"investigation":63,"to_source":272},"legality_review",{"id":273,"category":106,"method":107,"source_type":108,"document":274,"page":112,"section":239,"excerpt":240,"certainty":184,"curator_verified_at":14,"processed_at":116},596980,{"id":120,"title":89,"report_number":56,"report_date":73,"published_on":73,"page_count":121,"url":90,"available":63},{"changed":59,"unchanged":58,"completed":276,"ongoing":276},1,{"reports":278,"full_access":45},[279,280,281],{"id":88,"number":56,"title":89,"published_on":73,"document_url":90},{"id":82,"number":83,"title":84,"published_on":85,"document_url":86},{"id":282,"number":276,"title":283,"published_on":284,"document_url":285},"01M4EC619AM6XBHZSGZY0C8P1A","Verslag: 10-03-2026","2026-03-10","https:\u002F\u002Ffaillissement.app\u002Fdocuments\u002F01M4EC6374TZWXG6F1KD7SPZB7.pdf"]